{"id":1,"date":"2025-07-05T12:16:45","date_gmt":"2025-07-05T12:16:45","guid":{"rendered":"https:\/\/nee.sn\/?p=1"},"modified":"2025-07-05T12:46:13","modified_gmt":"2025-07-05T12:46:13","slug":"hello-world","status":"publish","type":"post","link":"https:\/\/nee.sn\/index.php\/2025\/07\/05\/hello-world\/","title":{"rendered":"Liste des References"},"content":{"rendered":"\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>item<\/td><td>Intitule du marche<\/td><td>Bureaux<\/td><td>client<\/td><td>pays<\/td><td>Montant<\/td><td>P\u00e9riode<\/td><\/tr><tr><td>1<\/td><td>Etude suivi et contr\u00f4le des travaux de construction de 48 centres de sant\u00e9s<\/td><td>NEE &nbsp;<\/td><td>Minist\u00e8re de la sante et d\u2019hygi\u00e8ne publique et la couverture maladie universelle<\/td><td>Cote d\u2019ivoire<\/td><td>822512425 FCFA<\/td><td>2021-2023<\/td><\/tr><tr><td>2<\/td><td>Etude suivi et contr\u00f4le des travaux de construction de 48 centres de sant\u00e9s<\/td><td>NEE\/SEEE<\/td><td>Minist\u00e8re de la sante du gouvernement du Mali<\/td><td>Mali<\/td><td>1 145 253 USD<\/td><td>2018-2020<\/td><\/tr><tr><td>3<\/td><td>Etude, contr\u00f4le et suivi des travaux de construction de 55 \u00e9coles primaires<\/td><td>AJEC\/NEE<\/td><td>MINISTERE&nbsp; DE LA PROMOTION DES INVESTISSEMENTS DES TRAVAUX PUBLICS, DES TRANSPORTES, DE L\u2019HABITAT ET DU TOURISME<\/td><td>GABONE<\/td><td>524 785 USD<\/td><td>2015-2019<\/td><\/tr><tr><td>4<\/td><td>Etude, contr\u00f4le et suivi des travaux de construction de 22 lyc\u00e9es secondaires<\/td><td>NEE\/SEEE<\/td><td>AGETIP-BENIN<\/td><td>BENIN<\/td><td>85 125 USD<\/td><td>2020-2022<\/td><\/tr><tr><td>5<\/td><td>Etude suivi et contr\u00f4le des travaux de construction de 15 coll\u00e8ges et 12 \u00e9coles primaires<\/td><td>NEE\/SEEE<\/td><td>AGETIP- MALI<\/td><td>MALI<\/td><td>58 485 789 FCFA<\/td><td>2018-2020<\/td><\/tr><tr><td>6<\/td><td>Etude, contr\u00f4le et suivi des travaux de construction de 22 centres de sant\u00e9s<\/td><td>NEE\/SEEE<\/td><td>MSAS<\/td><td>S\u00e9n\u00e9gal<\/td><td>&nbsp; &nbsp;<\/td><td>2018-2020<\/td><\/tr><tr><td>7<\/td><td>Etude suivi et contr\u00f4le des travaux de construction de 6 \u00e9coles primaires<\/td><td>NEE<\/td><td>OXFAM<\/td><td>S\u00e9n\u00e9gal<\/td><td>95 125 Euros<\/td><td>2020-2022<\/td><\/tr><tr><td>8<\/td><td>Etude suivi et contr\u00f4le des travaux de construction de notre si\u00e8ge R+6<\/td><td>NEE\/SEEE<\/td><td>Minist\u00e8re de la sant\u00e9 et de la protection sociale<\/td><td>Togo<\/td><td>245 000 Euros<\/td><td>2017-2019<\/td><\/tr><tr><td>9<\/td><td>Contr\u00f4le et surveillance des travaux de construction de 22 \u00e9coles primaires<\/td><td>Sari LTD\/ NEE<\/td><td>Minist\u00e8re de travaux publics<\/td><td>Madagascar<\/td><td>728 501,60 USD<\/td><td>2021-2023<\/td><\/tr><tr><td>10<\/td><td>Etude suivi et contr\u00f4le des travaux de construction de 5 \u00e9coles primaires<\/td><td>NEE<\/td><td>MEN<\/td><td>Senegal<\/td><td> 142 450 000 FCFA<\/td><td>2018-2020<\/td><\/tr><tr><td>11<\/td><td>Conception et la supervision et le contr\u00f4le des travaux de construction de 12 \u00e9coles primaires<\/td><td>NEE\/SEEE<\/td><td>Minist\u00e8re de l\u2019Education du Togo<\/td><td>Togo<\/td><td>425 241 USD<\/td><td>2019-2021<\/td><\/tr><tr><td>12<\/td><td>suivi des travaux de construction du p\u00f4le de distribution de Nouakchott Nord.<\/td><td>NEE <\/td><td>MHA<\/td><td>Mauritanie<\/td><td>19 500 000 MRU<\/td><td>En cours<\/td><\/tr><tr><td>13<\/td><td>contr\u00f4le des travaux d\u2019am\u00e9nagement de Marigot<\/td><td>NEE<\/td><td>MIEP<\/td><td>Tchad<\/td><td>425 000 USD<\/td><td>2019-2020<\/td><\/tr><tr><td>14<\/td><td>Contr\u00f4le et suivi des travaux sur les ouvrages de d\u00e9rivation&nbsp;<\/td><td>COBA\/ ENB\/ NEE<\/td><td>Minist\u00e8re des ressources en eau<\/td><td>Alg\u00e9rie<\/td><td>190696 358,89 DA TTC<\/td><td>2006-2011<\/td><\/tr><tr><td>15<\/td><td>Etude d\u2019avant-projet d\u00e9taille de l\u2019alimentation en eau potable<\/td><td>NEE\/SATEIG<\/td><td>Alg\u00e9rienne des eaux<\/td><td>Alg\u00e9rie<\/td><td>17 878 821,65 DA TTC<\/td><td>2012-2021<\/td><\/tr><tr><td>16<\/td><td>Etude de protection de communes de Birtouta ,Tessala El Merdja et Ouled Chebel contre les inondations<\/td><td>NEE <\/td><td>Minist\u00e8re des ressources en eau<\/td><td>Alg\u00e9rie<\/td><td>14 660 100.00 DA TTC<\/td><td>2009-2010<\/td><\/tr><tr><td>17<\/td><td>Contr\u00f4le et suivi des travaux de mise en place de r\u00e9seaux d\u2019eau AEP dans les villes Lemseila , souk Ahras et Laghouat (115 KM au total).<\/td><td>NEE<\/td><td>Direction des \u00e9quipements publics<\/td><td>Alg\u00e9rie<\/td><td>145 245 145 DA TTC<\/td><td>2016-2020<\/td><\/tr><tr><td>18<\/td><td>Contr\u00f4le des travaux r\u00e9habilitation de l\u2019approvisionnement en eau potable AEP des a\u00e9roports de Khartoum et d\u2019Omdourman, ainsi que Nil Vert&nbsp;&nbsp;<\/td><td>NEE<\/td><td>SUDAN AIRPORTS<\/td><td>SUDAN<\/td><td>245 120 USD<\/td><td>2019-2022<\/td><\/tr><tr><td>19<\/td><td>Revue des \u00e9tudes, pilotage et contr\u00f4le de travaux de r\u00e9habilitation, extension et am\u00e9nagement des aires de stockage&nbsp; de notre si\u00e8ge&nbsp; \u00e0 Lom\u00e9<\/td><td>NEE<\/td><td>Minist\u00e8re de la sant\u00e9 et de la protection sociale<\/td><td>Togo<\/td><td>15 241 616 411 FCFA TTC<\/td><td>2015-2018<\/td><\/tr><tr><td>20<\/td><td>suivi et le contr\u00f4le des travaux construction de Barrage de Bled Youssef<\/td><td>NEE<\/td><td>Minist\u00e8re des ressources en eau<\/td><td>Alg\u00e9rie<\/td><td>45 354 478 DA TTC<\/td><td>2018-2022<\/td><\/tr><tr><td>21<\/td><td>travaux de construction et am\u00e9nagement hydro-agricoles de barrage&nbsp; de&nbsp; Koudiet Errosfa et P\u00e9rim\u00e8tres Irrigues de Oued Fodda de 800 HA<\/td><td>NEE<\/td><td>Minist\u00e8re des ressources en eau<\/td><td>Alg\u00e9rie<\/td><td>36 365 450,00 DA TTC<\/td><td>2018-2022<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Item<\/strong><\/td><td><strong>DESIGNATION DU PROJET<\/strong><\/td><td><strong>Maitre de l\u2019ouvrage<\/strong><\/td><td><strong>Justification<\/strong><\/td><\/tr><tr><td><strong>01<\/strong><\/td><td>Etude d\u2019ex\u00e9cution du Collecteur Pointe Pescade Alger Nord \u2013 3<sup>\u00e9me<\/sup> Tranche<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>02<\/strong><\/td><td>Etude du sch\u00e9ma directeur d\u2019assainissement des centres de Relizane et Oued Rhiou (Lot 01&nbsp;: Centre de Relizane)<\/td><td>&nbsp; &nbsp;Direction des Ressources en Eau de la Wilaya de Relizane<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>03<\/strong><\/td><td>Etude de diagnostic et de r\u00e9habilitation du r\u00e9seau d\u2019assainissement de la ville de Mila<\/td><td>&nbsp; &nbsp;Direction de l\u2019Hydraulique de la Wilaya de Mila<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>04<\/strong><\/td><td>Etude de diagnostic et de r\u00e9habilitation du r\u00e9seau d\u2019assainissement de la ville de Bejaia<\/td><td>&nbsp; &nbsp;Direction de l\u2019Hydraulique de la Wilaya de Bejaia<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>05<\/strong><\/td><td>Etude de diagnostic et de r\u00e9habilitation du r\u00e9seau d\u2019assainissement des centres de Ferdoua et sidi Merouane<\/td><td>&nbsp; &nbsp;Direction de l\u2019Hydraulique de la Wilaya de Mila<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>06<\/strong><\/td><td>Etude de r\u00e9adaptation du sch\u00e9ma directeur d\u2019assainissement en fonction des nouveaux am\u00e9nagements de la nouvelle ville de Sidi Abdellah<\/td><td>&nbsp; &nbsp;Direction des Ressources en Eau de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>07<\/strong><\/td><td>Etude d\u2019assainissement, de collecte et d\u2019\u00e9puration des eaux us\u00e9es des agglom\u00e9rations de Mahelma, Rahmania et Souidania (STEP Nord)<\/td><td>&nbsp; &nbsp;Direction des Ressources Hydrauliques de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Item<\/strong><\/td><td><strong>DESIGNATION DU PROJET<\/strong><\/td><td><strong>Maitre de l\u2019ouvrage<\/strong><\/td><td><strong>Justification<\/strong><\/td><\/tr><tr><td><strong>08<\/strong><\/td><td>Etude de protection des communes de Birtouta, Tessala El Merdja et Ouled Chebel contre les inondations<\/td><td>&nbsp; &nbsp;Direction des Ressources en Eau de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>09<\/strong><\/td><td>Etude de Canalisation d\u2019Oued Ouchaiah<\/td><td>&nbsp; &nbsp;Direction des Ressources en Eau de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>10<\/strong><\/td><td>Etude d\u2019ex\u00e9cution du Collecteur Pointe Pescade Alger Nord \u2013 4<sup>\u00e9me<\/sup> Tranche<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>11<\/strong><\/td><td>Etude d\u2019ex\u00e9cution du Collecteur I Communal (C.I.C) \u2013 Partie aval.<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Item<\/strong><\/td><td><strong>DESIGNATION DU PROJET<\/strong><\/td><td><strong>Maitre de l\u2019ouvrage<\/strong><\/td><td><strong>Justification<\/strong><\/td><\/tr><tr><td><strong>01<\/strong><\/td><td>Etude de la station d\u2019\u00e9puration de la ville nouvelle de Bouinan (capacit\u00e9&nbsp;: 250.000 eq\/habitants)<\/td><td>&nbsp; Direction des Ressources en Eau de la Wilaya de Blida<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>02<\/strong><\/td><td>Etude d\u2019Avant-Projet D\u00e9taill\u00e9 de la station d\u2019\u00e9puration de la ville d\u2019Azzaba (capacit\u00e9&nbsp;: 83.000 eq\/habitants)<\/td><td>&nbsp; Direction des Ressources en Eau de la Wilaya de Skikda<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>03<\/strong><\/td><td>Etude d\u2019Avant-Projet D\u00e9taill\u00e9 de la station d\u2019\u00e9puration de la ville de bordj Ghedir (capacit\u00e9&nbsp;: 60.000 eq\/habitants)<\/td><td>Direction des Ressources en Eau de la Wilaya de Bordj Bou Arr\u00e9ridj<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>04<\/strong><\/td><td>Etude d\u2019Avant-Projet D\u00e9taill\u00e9 de la station d\u2019\u00e9puration de la ville d\u2019El Harrouch (capacit\u00e9&nbsp;: 179.000 eq\/habitants)<\/td><td>&nbsp; Direction des Ressources en Eau de la Wilaya de Skikda<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>05<\/strong><\/td><td>Etude d\u2019un syst\u00e8me d\u2019\u00e9puration&nbsp; de la partie Ouest du Groupement Urbain de Tlemcen (capacit\u00e9&nbsp;: 380.000 eq\/habitants)<\/td><td>&nbsp; Direction des Ressources en Eau de la Wilaya de Tlemcen<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>06<\/strong><\/td><td>Etude d\u2019Avant-Projet D\u00e9taill\u00e9 de la station d\u2019\u00e9puration de la ville d\u2019Oum Toub (capacit\u00e9&nbsp;: 51.600 eq\/habitants)<\/td><td>&nbsp; Direction des Ressources en Eau de la Wilaya de Skikda<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>07<\/strong><\/td><td>Etude de conception d\u2019une station d\u2019\u00e9puration des eaux&nbsp; de la ville de Hassi Bahbah (capacit\u00e9&nbsp;: 100.000 eq\/habitants)<\/td><td>&nbsp; Direction des Ressources en Eau de la Wilaya de Djelfa<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>08<\/strong><\/td><td>Etude de conception d\u2019une station d\u2019\u00e9puration des eaux de la ville de Messad (capacit\u00e9&nbsp;: 100.000 eq\/habitants)<\/td><td>&nbsp; Direction des Ressources en Eau de la Wilaya de Djelfa<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>09<\/strong><\/td><td>Etude d\u2019\u00e9puration des eaux us\u00e9es de l\u2019agglom\u00e9ration de Z\u00e9ralda (capacit\u00e9&nbsp;: 80.000 eq\/habitants)<\/td><td>Direction des Ressources Hydrauliques et de l\u2019Economie de l\u2019Eau de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Item<\/strong><\/td><td><strong>DESIGNATION DU PROJET<\/strong><\/td><td><strong>Maitre de l\u2019ouvrage<\/strong><\/td><td><strong>Justification<\/strong><\/td><\/tr><tr><td><strong>01<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de r\u00e9alisation de la station d\u2019\u00e9puration de la ville de Tamanrasset<\/td><td>Direction des Ressources en Eau de la Wilaya de Tamanrasset<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>02<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de r\u00e9alisation et exploitation de la station d\u2019\u00e9puration de la ville de Ain Sefra<\/td><td>Office National de l\u2019Assainissement En Groupement avec PROINTEC (Espagne)&nbsp;: 53 % Et NEE&nbsp;: 47 %<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>03<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de r\u00e9alisation du lagunage des eaux us\u00e9es de la ville de BIr Aissa<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya de Bordj Bou Arr\u00e9ridj<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>04<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de r\u00e9alisation du lagunage des eaux us\u00e9es de la ville d\u2019El Hammadia<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya de Bordj Bou Arr\u00e9ridj<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>05<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de r\u00e9alisation du lagunage des eaux us\u00e9es de la ville d\u2019Emir Abdelkader<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya d\u2019Ain Temouchent<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>06<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de r\u00e9alisation du lagunage des eaux us\u00e9es de la ville de Beni Fouda<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya de S\u00e9tif<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>07<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de r\u00e9alisation du lagunage des eaux us\u00e9es de la ville de Hammam Sokhna<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya de S\u00e9tif<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>08<\/strong><\/td><td>Etude et suivi des travaux de r\u00e9alisation du lagunage des eaux us\u00e9es de la ville de Sidi Senouci<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya de Tlemcen<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Item<\/strong><\/td><td><strong>DESIGNATION DU PROJET<\/strong><\/td><td><strong>Maitre de l\u2019ouvrage<\/strong><\/td><td><strong>Justification<\/strong><\/td><\/tr><tr><td><strong>09<\/strong><\/td><td>Assistance technique et surveillance des travaux de construction du transfert des eaux depuis l\u2019aval de la station de pompage aval de Ain Kercha vers le barrage de Koudiet Medaour Lin\u00e9aire Total du projet&nbsp;: 116 Km de Conduites en BPAT en DN 2.000mm.<\/td><td>&nbsp; Office National de l\u2019Irrigation et le Drainage<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>10<\/strong><\/td><td>Etude et suivi du renforcement de l\u2019AEP de la zone frontali\u00e8re de la Wilaya de Tlemcen Lin\u00e9aire du transfert&nbsp;: 23 Km, en DN 500 et 600 mm R\u00e9servoir circulaire de 1.000 m<sup>3<\/sup><\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya de Tlemcen<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>11<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de r\u00e9alisation de la station de traitement d\u2019eau potable du barrage de Kodiat Rosfa Lin\u00e9aire Total du projet&nbsp;: 14,6 Km Station de traitement&nbsp;: 46.000 m<sup>3<\/sup>\/J Quatre (04) r\u00e9servoirs de 5.000 m<sup>3 <\/sup>chacun Station de Pompage SP1&nbsp;: 2.690 m<sup>3<\/sup>\/h&nbsp;, Hmt&nbsp;: 170 m Station de Pompage SP2&nbsp;: 2.633 m<sup>3<\/sup>\/h&nbsp;, Hmt&nbsp;: 202 m Station de Pompage SP3&nbsp;: 211 m<sup>3<\/sup>\/h&nbsp;, Hmt&nbsp;: 246 m<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya de Tissemsilt<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>12<\/strong><\/td><td>Contr\u00f4le et suivi des travaux sur les ouvrages de d\u00e9rivation des eaux de l\u2019Oued Djer en Groupement avec (COBA \u2013 Portugal \u2013 46,81 %) \u2013 (ENB \u2013 Gr\u00e8ce \u2013 12,81 %) et (NEE \u2013 Alg\u00e9rie \u2013 40,38 %)<\/td><td>&nbsp; Office National de l\u2019Irrigation et le Drainage<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Item<\/strong><\/td><td><strong>DESIGNATION DU PROJET<\/strong><\/td><td><strong>Maitre de l\u2019ouvrage<\/strong><\/td><td><strong>Justification<\/strong><\/td><\/tr><tr><td><strong>13<\/strong><\/td><td>Assistance technique et suivi de r\u00e9alisation du collecteur Pointe Pescade Alger Nord \u2013 1<sup>\u00e9re<\/sup> Tranche<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>14<\/strong><\/td><td>Suivi de r\u00e9alisation du collecteur Pointe Pescade Alger Nord \u20133<sup>\u00e9me<\/sup> Tranche<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>15<\/strong><\/td><td>Contr\u00f4le et suivi des travaux de d\u00e9doublement de la conduite de transfert El Harrach \u2013 Dou\u00e9ra.<\/td><td>&nbsp; Office National de l\u2019Irrigation et le Drainage<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><tr><td><strong>16<\/strong><\/td><td>Suivi de r\u00e9alisation de la station de pompage (2 Qts = 1.680 l\/s) du collecteur Pointe Pescade Alger Nord \u20133\u00e9me Tranche<\/td><td>&nbsp; Direction de l\u2019Hydraulique de la Wilaya d\u2019Alger<\/td><td>&nbsp; Attestation de bonne ex\u00e9cution<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Item<\/strong><\/td><td><strong>DESIGNATION DU PROJET<\/strong><\/td><td><strong>Maitre de l\u2019ouvrage<\/strong><\/td><td><strong>Justification<\/strong><\/td><\/tr><tr><td><strong>01<\/strong><\/td><td>&nbsp; Assistance technique et suivi des travaux de r\u00e9alisation de la station d\u2019\u00e9puration de la Ville Nouvelle de Boughzoul<\/td><td>&nbsp; Etablissement Public de la Ville Nouvelle de Boughzoul<\/td><td>&nbsp; Ordre de service de d\u00e9marrage des travaux<\/td><\/tr><tr><td><strong>02<\/strong><\/td><td>&nbsp; Assistance technique et suivi des travaux de r\u00e9alisation de la station d\u2019\u00e9puration de la Ville Nouvelle d\u2019El M\u00e9n\u00e9aa<\/td><td>&nbsp; Etablissement Public de la Ville Nouvelle d\u2019El M\u00e9n\u00e9ea<\/td><td>&nbsp; Ordre de service de d\u00e9marrage des travaux<\/td><\/tr><tr><td><strong>03<\/strong><\/td><td>&nbsp; Contr\u00f4le et approbation des \u00e9tudes d\u2019ex\u00e9cution, ainsi que le suivi, contr\u00f4le et coordination des travaux de la voierie et r\u00e9seaux divers (primaires et secondaires) des sites de la Ville Nouvelle de Hassi Messaoud et de la zone d\u2019activit\u00e9s. Groupement constitu\u00e9 de&nbsp;: SAETI \u2013 NEE \u2013 LTPS.<\/td><td>&nbsp; Etablissement Public de la Ville Nouvelle de Hassi Messaoud<\/td><td>&nbsp; Ordre de service de reprise des travaux<\/td><\/tr><tr><td><strong>04<\/strong><\/td><td>&nbsp; Assistance technique et suivi des travaux de r\u00e9alisation de la station d\u2019\u00e9puration de la Ville de Timimoun<\/td><td>&nbsp; Office National d\u2019Assainissement<\/td><td>&nbsp; Ordre de service de reprise des travaux<\/td><\/tr><tr><td><strong>05<\/strong><\/td><td>&nbsp; Contr\u00f4le et suivi des travaux de r\u00e9habilitation du syst\u00e8me d&rsquo;AEP de la Ville de Batna &#8211; Tranche 1<\/td><td>&nbsp; Alg\u00e9rienne Des Eaux<\/td><td>&nbsp; Ordre de service de d\u00e9marrage des travaux<\/td><\/tr><tr><td><strong>06<\/strong><\/td><td>&nbsp; Suivi de r\u00e9alisation de 02 stations de relevage des eaux us\u00e9es de la Ville nouvelle de Boughzoul<\/td><td>&nbsp; Etablissement Public de la Ville Nouvelle de Boughzoul<\/td><td>&nbsp; Ordre de service de d\u00e9marrage des travaux<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>item Intitule du marche Bureaux client pays Montant P\u00e9riode 1 Etude suivi et contr\u00f4le des travaux de construction de 48 centres de sant\u00e9s NEE &nbsp; Minist\u00e8re de la sante et d\u2019hygi\u00e8ne publique et la couverture maladie universelle Cote d\u2019ivoire 822512425 FCFA 2021-2023 2 Etude suivi et contr\u00f4le des travaux de construction de 48 centres de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/posts\/1","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/comments?post=1"}],"version-history":[{"count":4,"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/posts\/1\/revisions"}],"predecessor-version":[{"id":13,"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/posts\/1\/revisions\/13"}],"wp:attachment":[{"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/media?parent=1"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/categories?post=1"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nee.sn\/index.php\/wp-json\/wp\/v2\/tags?post=1"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}